The aircraft may be new, but the FAA will still evaluate the operator behind it. That makes one of the earliest eVTOL business decisions an operational decision: build a new Part 135 certificate around the aircraft, or introduce the aircraft through an existing certificate holder.

My working view is that an established operator will often have the faster and more defensible path. It already has an operating history, management structure, manuals, training controls, maintenance processes, records, operational control, and a relationship with its FAA oversight office. Those assets do not make approval automatic. They do reduce the number of systems that must be created from zero.

The comparison is not a certificate versus 25 flight hours

A common shorthand says that a startup must endure a long initial-certification project while an existing operator only needs 25 hours of proving tests. That comparison is too simple and can create a false launch schedule.

Section 135.145 requires at least 25 hours of proving tests when a certificate holder proposes to operate a turbojet aircraft, or an aircraft for which two pilots are required under VFR, and has not previously used that kind of aircraft in Part 135 service. The FAA describes those tests as a full-scale simulation of revenue operations. Five hours must be flown at night, and when IFR operations are requested, five instrument approaches must be flown under simulated or actual instrument conditions.

Whether that exact provision applies to a particular powered-lift design will depend on the aircraft, its approved configuration, and the proposed operation. Even when proving tests apply, they are a demonstration near the end of a much larger readiness effort—not a substitute for that effort.

The 25-hour proving program is a demonstration requirement, not a complete aircraft-addition checklist.

What a new Part 135 applicant must build

Initial certification is a five-phase process: pre-application, formal application, design assessment, performance assessment, and administrative functions. The applicant must show more than a good business plan and access to an aircraft.

The certification basis must be converted into an operating system. That includes qualified management, a principal base, economic authority or air-taxi registration as applicable, insurance, exclusive use of at least one suitable aircraft, manuals, an approved training program, maintenance arrangements, recordkeeping, operational-control procedures, an SMS, and evidence that people can perform the work described in the documents.

For eVTOL, the applicant is building that company while also absorbing a new aircraft category, new type-specific pilot qualifications, new energy and charging interfaces, new maintenance tasks, new emergency-response assumptions, and a developing infrastructure network. Each unknown can create a dependency on the manufacturer, training provider, vertiport, utility, or FAA specialist.

What an existing operator may already have

An established certificate holder may already possess the organizational controls that take the longest to make credible. Its managers know how the FAA interacts with the company. The manuals have been used in real operations. Training and checking records have an established format. The operator has experience controlling flights, handling maintenance discrepancies, managing vendors, tracking qualifications, responding to surveillance, and closing corrective actions.

That operating history is valuable because the eVTOL project can be treated as a controlled change to a functioning system. The operator can identify which procedures remain valid, which must be revised, and which are genuinely new. It can run the change through its SMS, assign owners, build evidence, test the interfaces, and show how the new aircraft fits the certificate holder’s existing responsibilities.

  • Existing management and operational-control structure.
  • Approved manuals and training-program architecture.
  • Maintenance and recordkeeping processes that can be adapted.
  • A functioning SMS and change-management process.
  • Experience with FAA submissions, demonstrations, surveillance, and corrective action.
  • A current operation that can support realistic transition and recovery planning.

Existing does not mean easy

Adding eVTOL to a certificate could still require substantial FAA review and approval. The operator may need new or amended OpSpecs, manual revisions, aircraft conformity, approved training and checking, powered-lift pilot qualifications and type ratings, maintenance-program decisions, minimum-equipment provisions when applicable, new vendor controls, and demonstrations or proving tests acceptable to the Administrator.

The operator must also prove that the new aircraft does not weaken the existing operation. A management team that is already stretched, a fragile records system, an immature SMS, or unresolved surveillance findings can make the established certificate a poor platform. The right question is not simply whether a certificate exists. It is whether the certificate holder has the capacity and discipline to absorb a new aircraft category safely.

When a clean-sheet certificate may still be the better choice

A new certificate may be justified when the proposed eVTOL operation has a different ownership structure, management team, principal base, business model, risk profile, or operating concept from the existing carrier. It may also be appropriate when the existing operator cannot dedicate the people, aircraft, manuals, and safety resources required for the project.

A clean-sheet certificate can be designed around one aircraft and one mission without inheriting unrelated processes. The tradeoff is time and execution risk. The applicant must prove the entire organization while the aircraft, training system, maintenance program, infrastructure, and commercial plan are still developing.

A practical case-study structure

Before choosing a path, compare both models against the same evidence. Do not compare an optimistic startup schedule with an established operator’s worst-case change process. Build two realistic work breakdowns and identify the critical path for each.

  • Authority: certificate type, kinds of operation, route structure, economic authority, and requested OpSpecs.
  • Aircraft: certification status, conformity, equipment, limitations, dispatch assumptions, and delivery sequence.
  • People: management capacity, powered-lift pilot qualifications, instructor and check-pilot pipeline, and mechanic training.
  • Programs: manuals, training, checking, maintenance, MEL strategy, SMS, recordkeeping, and operational control.
  • Infrastructure: landing sites, charging, utility capacity, fire response, weather information, security, and passenger handling.
  • Demonstration: validation, proving tests if applicable, route trials, abnormal scenarios, and evidence closure.
  • Recovery: spare aircraft, passenger reaccommodation, maintenance response, energy interruption, and weather diversion.

The strongest early model may be a controlled addition

For many early passenger or cargo missions, the most credible path will be a partnership with a capable Part 135 operator that can isolate the eVTOL project without separating it from the carrier’s mature controls. The operator can start with a narrow fleet, limited routes, conservative weather criteria, dedicated personnel, and a clearly defined approval package.

That approach also creates a better learning loop. Early experience can feed the SMS, training revisions, maintenance planning, route limitations, and infrastructure decisions before the aircraft is scaled across bases or missions.

The competitive advantage will not belong only to the company that obtains an aircraft first. It will belong to the operator that can show—clearly and repeatedly—how the aircraft fits into a safe, compliant, and dependable Part 135 system.

This article provides general operational analysis, not legal advice or a determination of what the FAA will approve for a specific aircraft or certificate holder. Requirements depend on the aircraft certification basis, approved limitations, proposed operation, certificate scope, OpSpecs, manuals, and FAA findings.